subsea
mattress lay
castle ship technical management
Subsea mattress lay
We have two systems capable of subsea mattress lay AND mattress removal.
I-GRAB system: This solution launches one mattress at a time. The IGRAB ROV is attached to the mattress frame and propels mattress into position using the 4 powerful subsea thrusters. The hydraulic power pack then releases the pins on the frame to release the matt in position. The advantage with this system is that a single spread of equipment does the entire job; The ROGE ROV surveys (video / sonar) a pipeline or cable track, and then also lays the Matts and post surveys. One single system does all. Low cost solution with no separate ROV or diver solution required.
MDS 3 system: with the capability to launch and lay three mattress units at the same time. This unit uses 4 powerful subsea thrusters to change the heading and assist to position the matts accurately on the sea floor. Atlantic Discovery or Atlantic Tonjer will operate this system. (Track record: Project Sept 2016, German waters. IGRAB ROV system simultaneously fitted with a cable tracker to assist with post lay burial inspection and mattress survey)
ATLANTIC DISCOVERY
UK NORTH SEA
ATLANTIC TONJER
EU AND UK NORTH SEA
Head Office: C3 Knoll Business Centre
325-327 Old Shoreham Road
Hove BN3 7GS. UK.
Marine Base: Berth 28, 244B Southdown Road, Great Yarmouth, Norfolk NR31 OJJ. UK.
Reception
+44 (0)1273 09 93 70
Charter Sales
+44 (0)1273 12 10 72
Crewing & HR
+44 (0)1273 09 93 74